We plan the exact path and depth before the drywall goes up.
A recessed channel is built into the wall or ceiling to hold the LED strip flush with the surrounding surface.
The LED strip and wiring are set into the channel before drywall closes it in.
Drywall is finished flush along the channel edge — no visible housing.
We check the line is straight and consistent before paint.
The strip is powered on and checked for an even glow before we call it done.
Most projects can be estimated from photos. When needed, we'll schedule an on-site walkthrough to confirm the scope.
You'll receive a realistic estimate with no hidden fees or surprise charges. If a site visit is needed, we'll schedule one before providing the final quote.
Once approved, we'll schedule your project and complete the drywall installation and finishing with the same crew—from the first sheet to the final walkthrough.